Equipment room for the pool – plan space for all pool equipment

The equipment room houses the equipment that makes the pool work. A well-planned location makes filtration and water treatment easier to manage and provides space for servicing. Equipment can sometimes be placed in a cabinet or freestanding space, but there is no one-size-fits-all solution that suits all pool sizes and installations.

Pool equipment room – plan space for all pool equipment – product image from Pooltime's range
Product image from Pooltime's range. Check current product information.

What equipment needs to fit?

Start with a list of the circulation pump, filter, valves, pipes, and any automation. Add equipment for heating and water treatment, as well as what is required for electricity and control. Remember that filter lids, connections, and valves must also be accessible when the system needs to be serviced. A space that barely fits the products on the drawing can still be impractical.

Location near the pool

Pipe lengths, height differences, and head pressure affect the pump's operating conditions. At the same time, noise, service access, and the distance to the swimming area may call for a different location. Let the installation be sized according to the equipment's requirements; do not place equipment without also checking how water enters and leaves.

Dry, ventilated, and easy to service

The equipment room needs to be protected from unwanted water, moisture, and conditions for which the equipment is not designed. Follow the manufacturers' requirements for ventilation and ambient temperature. For electrical components and chemical handling, special care is required regarding separation, safety, and responsible professional competence. Do not store chemical products where they risk affecting other equipment.

Plan for filter servicing and winter

A sand filter may need to be backwashed or have its filter medium replaced. The pump may need to be opened, and valves must be able to be closed. Also plan for how pipes and equipment will be handled during the winter. Drainage and the floor's construction need to be adapted to the conditions and applicable requirements.

Checklist before drawing and quote

Sketch where the pool, pipework, and equipment area will be located.

Specify filter type, pump model, and any automatic water treatment.

Mark the door opening, service areas, and access for larger components.

Examine electricity, ventilation, noise, and water management with a responsible installer.

Plan space for future servicing and potential add-ons.

Frequently asked questions

How big should an equipment room be?

There is no single correct size. It must be sized for the actual equipment, service space, and installation requirements.

Can all pool equipment be placed outdoors?

It depends on the units' protection rating and the manufacturer's instructions. Some products require different protection.

Does the heat pump have to be in the equipment room?

Not necessarily. Air-source heat pumps for pools need conditions for airflow according to their manual.

Plan with Pooltime

Explore water treatment (/collections/vattenrening) and pumps and electrical cabinets (/collections/poolpump-och-elskap). Read about pool installation (/pages/poolinstallation) and contact a pool expert (/pages/prata-med-en-poolexpert) with a simple sketch of the property and equipment area.

Related products and guides